Contact Klean Power About Your Waste to Energy Project
Contact Klean Power
To arrange a consultation with the Klean Industries team, send us an email. If you are considering a project, purchase and/or application of a Klean Industries solution, the enquiry form lets us understand your business requirements and direct your enquiry to the appropriate department to schedule a follow-up call.
What to Tell Us
Waste to energy enquiries are assessed faster when the basics arrive in the first message. Please include the following.
- Feedstock and tonnage — the composition of the municipal solid waste stream and the annual or daily tonnage you need to process.
- Location and jurisdiction — permitting, emissions limits and grid connection all follow from where the facility will sit.
- Stage — concept, feasibility, procurement, permitted or shovel-ready.
- Role — municipality, developer, utility, investor or operator, and whether the project is structured as a public-private partnership.
- Scope — technology supply only, design and engineering, or turn-key delivery as general contractor.
Supporting Documents Help
Attachments are welcome with the enquiry form, which accepts PDF, JPG, GIF and PNG files. If you already hold a waste composition study, a feasibility study, a draft procurement specification, offtake or gate-fee terms, or grid connection correspondence, attach it. Those documents move an enquiry from a conversation to a technical assessment. If you have none of them, that is not a disqualification; it tells us the project is early stage and should begin with a feasibility study or an energy and waste audit.
Who You Are Talking To
Klean Power is wholly owned by Klean Industries and is part of the Klean Group of Companies. Its Advanced Thermal Recycling (ATR®) technology was selected by the City of Vancouver for the GVRD Waste to Energy Project, short listed from 21 different technology vendors as a key technology supplier. ATR® combines the lowest achievable emissions with the highest landfill diversion rate of any commercially-available technology, so the first conversation is usually about how your waste stream maps onto that performance rather than about whether the technology is proven.
What Happens Next
Your enquiry is routed to the department that matches the scope, whether that is a feasibility study, plant design and engineering, due diligence or turn-key EPC delivery as general contractor. Klean Industries supplies components, acts as general contractor for entire facilities, and supports operating plants with spare parts and consulting, so the scope can widen later without changing supplier. You will be told which route fits your project, what information is needed next, and who will be on the follow-up call.
Start Your Waste to Energy Conversation
Send Klean Power your feedstock, tonnage, location and project stage, and the enquiry reaches the right technical department first time.
Klean Power's ATR® technology was selected by the City of Vancouver for the GVRD Waste to Energy Project after being short listed from 21 technology vendors.
What tonnage of municipal solid waste do you need to process?
Contact Klean Industries about a waste to energy project » GO.